Excavation pit depth is 32 meters. Complex engineering and geological construction conditions.
Solutions
Open construction method. The pit fence is made of secant bored piles, application of special production methods (water drawdown, cementation of soils).
Halt platform behind the Nizhnie Mnevniki metro station
Features of the project
Excavation pit depth is up to 25 meters. Complex engineering and geological construction conditions, construction of the 2nd stage of the halt platform after commissioning of the 1st stage.
Solutions
Open construction method. The pit fence is made of secant bored piles, application of special production methods (water drawdown, cementation of soils).
ABOUT
Scope of work - General Design
Design stages - Complete project and working documentation (structural solutions+CMP+estimates)
Status - Commissioned
Similar projects
Mixed use complex AKHMAT TOWER
A unique building project that includes office space, shopping malls, a luxury hotel, restaurants, sports grounds and panoramic observation decks.
Timiryazevskaya Transport Hub
Part o the mixed use complex is located in the Northen Administrative District of Moscow in the Begovoy region, on the territory of the Second Watch Factory "Slava"
Mixed use apartment complex SLAVA
Mixed use apartment complex SLAVA — a landmark premium class project in the center of Moscow. Development of information models from concept to operation within general design.
Residential complex LEVEL Nagatinskaya
Mixed use residential complex with underground parking
We use cookies to make your experience on our website better.